Taking advantage of a day off, I drove the long drive early this morning, which was made a little easier with the falling gas prices. Gas was still ~ 2.50 up north though, but they are slowly dropping. I spoke with Ken on Friday and he told me they had the 1st floor walls were up, and the roof was partially sheathed. Imagine my surprise to see the progress since then! The front windows are roughed out, the shed dormer was built, more than half the roof was done!
The left side and rear side construction are pretty plain. We discussed locations for 2 windows on the ground level, and decided on one the left and right sides.
The dormer is shaping up nice as well. All you see was assembled in just about 1 week. Of course I had to go upstairs and check out that as well. The space is much bigger than I imagined, and with the bump out for the dormer, it adds a whole new space perspective.
One other sign I saw that reminded me why we were doing this. The snowmobile trail signs were put up in the last week or so!